The project
Each box carries stay cables at their exact angle, so the anchor tubes and bearing plates had to land within millimetres, box after box.
What we made
- Anchor box plates and diaphragms
- Anchor tubes at the cable angles
- Bearing plates
- Shear studs for the concrete
How we built it
- Deratech Supera-H 12030 fibre laserThick E410 plates cut to profile.
- Manual MIG weldingWelded to qualified procedures.
- SKDX1030 CNC end-face millingBearing faces machined square.
All 60 boxes delivered and built into the pylons of one of India’s most watched bridges.