Pile Guide Frames & Templates

Templates that set out new piles for a jetty or trestle: a braced frame clamped to piles already driven, with guide sleeves at 2 levels set to each pile’s rake.

Explore the 3D model Send us a drawing
Allmarc 3D model · to scale
Explore the model

How it is built.

Scroll: the camera moves to each part in turn and ends on the exploded view. Drag to turn it round yourself.

Loading model 0%

01 / 07

Setting out a jetty bent

The template clamps to piles already driven and holds the next ones in position, including raked piles, while they are pitched and driven.

Scroll to see how it is built · drag to turn it round

02 / 07

Template frame

A two-level braced frame whose sleeve positions are the pile positions.

How is it possible at Allmarc?
Kotec newRun10DX CNC beam drilling line in the Allmarc works

Used here for: Template frame

Heavy profiles that need precise holes, where plasma cannot do the job: the lower structure and panel borders of a ground flare, and every bolted PEB and multi-storey frame.

  • H-beams up to 1,000 x 500 mm
  • Drills 3 faces in one pass
  • Channels, angles and box sections
All our machinery

03 / 07

Guide sleeves

Rolled sleeves at 2 levels; the offset between them sets the rake.

How is it possible at Allmarc?
Three-roll pinch cum pyramid plate rolls in the Allmarc works

Used here for: Guide sleeves

  • Rolls plate up to 40 mm
All our machinery

04 / 07

Rollers

Rollers that centre each pile in its sleeve.

05 / 07

Clamps

Clamps that fix the template to the piles already in.

06 / 07

Walkway

A walkway for the piling crew.

07 / 07

A kit of parts

Frame, sleeves, rollers and clamps: every member numbered, match-marked and packed in erection sequence.

Why Allmarc

Experience you can trust.

We fabricate to your drawings and prove the fit in our own bay before anything ships. Open any line for the detail.

Talk to an engineer
Heavy rolled plate
  • Leg sections and yoke rings rolled from thick plate.
  • Seams welded on the submerged-arc line.
Round and true
  • Rings braced round while they are welded out.
  • Pin holes cut and checked to jig.
Fitted in the works
  • Yokes, guides and leg sections fitted together before dispatch.
  • A 30 m wide bay with 11.5 m under the hook.
To the designer’s drawings
  • Hydraulics, winches and cranes come from their makers.
  • We build the steel they work in.
Start a project

Have a drawing? Let us build it.

We fabricate to your design, from plate to a packed container. An engineer will tell you honestly how we would build it.

Send us a drawing