Four enclosed ground flare systems of about 550 T each, with in-house rolling, high-accuracy fit-up and large-scale welded construction.
Allmarc Industries delivered high-end fabrication for Zeeco’s EGF Project, part of Louisiana LNG Infrastructure Development in the USA. The project consisted of four totally enclosed dry ground flare systems, with each system weighing approximately 550 T. Each chamber has a diameter of 20 m and a height of 46 m, with a total fabrication volume of 2,200 T. With meticulous engineering, in-house rolling, high-accuracy fit-up and large-scale welded construction, Allmarc showcased global fabrication excellence across complex chambers, industrial assemblies and critical energy infrastructure.