The steel superstructure on a jetty head: a raised loading platform, pedestals for the marine loading arms, an access tower and a gangway down to the ship.

Explore the 3D model Send us a drawing
Allmarc 3D model · to scale
Explore the model

How it is built.

Scroll: the camera moves to each part in turn and ends on the exploded view. Drag to turn it round yourself.

Loading model 0%

01 / 07

On the jetty head

The concrete jetty and piles are the civil contractor’s; the arms are the arm maker’s. The steel in between is ours.

Scroll to see how it is built · drag to turn it round

02 / 07

Loading platform

A raised platform on columns with a Grip-Strut deck and a stair.

How is it possible at Allmarc?
Kotec newRun10DX CNC beam drilling line in the Allmarc works

Used here for: Loading platform

Heavy profiles that need precise holes, where plasma cannot do the job: the lower structure and panel borders of a ground flare, and every bolted PEB and multi-storey frame.

  • H-beams up to 1,000 x 500 mm
  • Drills 3 faces in one pass
  • Channels, angles and box sections
All our machinery
Grip-Strut walkway automation line in the Allmarc works

Used here for: Loading platform

  • Punching, embossing, edge bending, shearing
  • Single-piece planks up to 8 m
All our machinery

03 / 07

Arm pedestals

Pedestals rolled from plate, with gusseted base rings that bolt to the arm maker’s flange.

How is it possible at Allmarc?
Three-roll pinch cum pyramid plate rolls in the Allmarc works

Used here for: Arm pedestals

  • Rolls plate up to 40 mm
All our machinery

Used here for: Arm pedestals

In 2024 we were the only buyer of Deratech’s 20 kW, 12 m laser.

  • 20 kW
  • 12 x 3 m bed
  • Pallet changer
All our machinery

04 / 07

Access tower and gangway

A braced tower with landings at deck heights, and the gangway down to the ship.

05 / 07

Handrails and ladder

Handrails round every open edge and a caged ladder up the tower.

06 / 07

Coated for the sea

Blasted and coated in our booths under a full-time Level 2 coating inspector.

How is it possible at Allmarc?
Blasting and painting booths in the Allmarc works

Used here for: Coated for the sea

A Level 2 coating inspector on the floor full time; weather checked and a test before every batch of paint.

  • Dust collection
  • 15 m paint booth for long sections
  • Sa 2.5 blasting
All our machinery

07 / 07

A kit of parts

Platform, pedestals, tower and gangway: every member numbered, match-marked and packed in erection sequence.

Why Allmarc

Experience you can trust.

We fabricate to your drawings and prove the fit in our own bay before anything ships. Open any line for the detail.

Talk to an engineer
Structural steel at scale
  • 4 plants at Kanbha; about 6,000 T a month from November 2026.
  • Plate, sections and built-up members in house.
Trial-assembled
  • Fit-up proven in the works.
  • Match-marked for bolt-up on site.
Finished before dispatch
  • Blast, prime and paint in house; galvanised finishes on request.
  • Access steel fitted in the works.
Packed for the journey
  • Export packing we designed ourselves.
  • Shipped as numbered kits.
Start a project

Have a drawing? Let us build it.

We fabricate to your design, from plate to a packed container. An engineer will tell you honestly how we would build it.

Send us a drawing